COMPLETED PROJECTS

ALL PROJECTS

(Updated 5 Dec 2009)

  1. Construction of 2000 living units & service buildings
  2. Upgrade Tagriffet Control Building
  3. Concreting works for Nalut Flow Control Station (NFCS) Regulating Tank
  4. Construction of Reservoir Tanks at Gharyan Water Supply Project
  5. Concreting Works of Pumping Stations 1 and 2
  6. Concreting Works of Pumping Stations 3 and 4
  7. Technical Services to Al-Nahr Company Ltd
  8. Construction of Maintenance workshop at Samah Oilfields for Waha Oil Company
  9. Construction of Al-Juawaibiyah Regulating Tank at Nalut
  10. Oilfield Services at Ghani Oilfields
  11. Oilfield Services at Amal Oilfields
  12. Technical Services to LISCO
  13. Construction of Green Printing Press Complex
  14. Construction of Pump Stations & Turnout Headworks
  15. Construction of Accomodation Blocks
  16. Construction of Heavy Equipment Workshop
  17. Construction of 177 Farm Tanks
  18. Construction and repair of Amal Airport

Please Scroll down for project descriptions & status


Upgrade Tagriffet Control Building

DATE OF CONTRACT:

31 August 2009

CLIENT'S NAME:

VEBA Oil Operations. (Petro Canada)

PROJECT VALUE:

USD 1,380,000.00

PROJECT LOCATION:

Ghani Oilfields, Libya

PROJECT DURATION:

5 Months

PROJECT DESCRIPTION:

The project comprises of construction of a new control room building with steel portal frame, block walls and sandwich panel roof. The work also includes design and installation of HVAC system, telephone, electrical, general and emergency lighting, sanitary and waste water system, potable water system, fire water, fire fighting and fire alarm systems. Work is in progress as per approved schedule.

team image

 

team image

Concreting works for Nalut Flow Control Station (NFCS) Regulating Tank

DATE OF CONTRACT:

10 October 2009

CLIENT'S NAME:

Al Nahr Company (Fully owned by Great Man-made River Authority)

PROJECT VALUE:

USD 70 million

CONSTRUCTION WORK:

LD 990,329.000

PROJECT LOCATION:

Nalut, Gadames-Zwara-Al Zawiah Water System for Great Man-Made River project, Libya

PROJECT DURATION:

14 Months

PROJECT DESCRIPTION:

The work comprises of civil construction of 70,000 cubic meter capacity regulating tank with specialized formwork for columns, walls and roof panels. The work involved about 12678 cubic meters of concrete work and 2100 tons of rebar fabrication and installation. Work is in progress and is expected to be completed ahead of schedule.

team image

 

team image

Construction of Reservoir Tanks at Gharyan Water Supply Project

DATE OF CONTRACT:

5 August 2009

CLIENT'S NAME:

Al Nahr Company (Fully owned by Great Man-made River Authority)

PROJECT VALUE:

USD 10 million

CONSTRUCTION WORK:

LD 370,920.000

PROJECT LOCATION:

Gharyan Water Supply Project PH-2, Gharyan, Libya

PROJECT DURATION:

06 Months

PROJECT DESCRIPTION:

The work comprises of civil construction of 4 No. reservoir tanks with capacities ranging from 1000 to 3000 cubic meter with specialized formwork for columns, walls and roof panels. The work involved about 3091 cubic meters of concrete work and 500 tons of rebar fabrication and installation. Work is in progress as per approved schedule.

team image

Concreting Works of Pumping Stations 1 and 2

DATE OF CONTRACT:

06 October 2008

CLIENT'S NAME:

Al Nahr Company (Fully owned by Great Man-made River Authority)

PROJECT VALUE:

USD 70 million

CONSTRUCTION WORK:

LD 1,586,700.00

PROJECT LOCATION:

Gadames, Gadames-Zwara-Al Zawiah Water System for Great Man-Made River project, Libya

PROJECT DURATION:

16 Months

PROJECT DESCRIPTION:

The work comprises of civil construction of two 20,000 cubic meter capacity forebay tanks, two pumping stations with electrical buildings, chlorination buildings, feeder tanks, shafts and other appurtenant structures. The work involved about 16738 cubic meters of concrete work and 2500 tons of rebar fabrication and installation. Both forebay tanks and pumping stations with electrical buildings have been completed ahead of approved schedule. Work on the remaining appurtenant structures is progressing as per approved schedule.

team image

 

team image

Construction of 2000 living units and service buildings

DATE OF CONTRACT:

6 July 2008

CLIENT'S NAME:

Housing Infrastructure Board, Tripoli, Libya.

PROJECT VALUE:

LD 220,816,000.00

PROJECT LOCATION:

AL Khums, Libya

PROJECT DURATION:

27 Months

PROJECT DESCRIPTION:

The original project comprised of development of a master plan over an area of 102 hectares along with design and construction of 2000 living units and associated public buildings near the city of Alkhoms, district Almarqab. However on 26 November 2008 the scope of development of master plan increased from 102 hectares to 237 hectares and as per changed requirements a new master plan accommodating 3450 units and associated public buildings has been prepared and submitted. In addition to the housing units urban plan includes service buildings, public buildings, parks and roads. Utilities like water, power and sewerage for the development project are integrated with the regional infrastructure.

Mobilization has been completed at site and client approval for buildings and master plan is awaited to commence work. The work is expected to be completed within the stipulated construction period of 27 month after receipt of design approval and site hand over.

team image

 

team image

Concreting Works of Pumping Stations 3 and 4

DATE OF CONTRACT:

25 May 2008

CLIENT'S NAME:

Al Nahr Company (Fully owned by Great Man-made River Authority)

PROJECT VALUE:

USD 70 million

CONSTRUCTION WORK:

LD 1,131,592.000

PROJECT LOCATION:

Aljuwaibiyah, Gadames-Zwara-Al Zawiah Water System for Great Man-Made River project, Libya

PROJECT DURATION:

22 Months

PROJECT DESCRIPTION:

The work comprises of civil construction of one 20,000 cubic meter capacity forebay tank, two pumping stations with electrical buildings, chlorination buildings, feeder tanks and other appurtenant structures. The work involved about 11333 cubic meters of concrete work and 1900 tons of rebar fabrication and installation. Work on the last pumping station is in progress as per approved schedule. All the remaining works have been completed ahead of schedule.

team image

 

team image

Construction of Maintenance workshop at Samah Oilfields for Waha Oil Company

DATE OF CONTRACT:

5 December 2007

CLIENT'S NAME:

Industrial Engineering Company

PROJECT VALUE:

LD 1,950,000.00

PROJECT LOCATION:

Samah Oilfields, Libya

PROJECT DURATION:

9 Months

PROJECT DESCRIPTION:

The scope of work comprised of design and construction of a workshop for welding, AC repair and equipment maintenance with covered area of 3000 sqm. The steel structure consists of 8m high and 20m span portal frames with provision of two gantry cranes of 5 and 10 tons. A mezzanine floor with composite roof construction provides space for storage, facilities and offices. Being a fast track project, design along with procurement of off shore materials was completed well ahead of construction schedule. Further activities are on hold due to client pending contractual obligations.

team image

 

team image

Construction of Al-Juawaibiyah Regulating Tank at Nalut

DATE OF CONTRACT:

17 December 2007

CLIENT'S NAME:

Al Nahr Company (Fully owned by Great Man-made River Authority)

PROJECT VALUE:

USD 70 million

CONSTRUCTION WORK:

LD 996,478.000

PROJECT LOCATION:

Aljuwaibiyah, Gadames-Zwara-Al Zawiah Water System for Great Man-Made River project, Libya

PROJECT DURATION:

20 Months

PROJECT DESCRIPTION:

The work comprises of civil construction of 70,000 cubic meter capacity regulating tank with specialized formwork for columns, walls and roof panels. The work involved about 11850 cubic meters of concrete work and 2000 tons of rebar fabrication and installation. Work has been completed as per approved construction schedule.

team image

Oilfield Services at Ghani Oilfields for Harouge Oil Operations

DATE OF CONTRACT:

11 December 2007

PROJECT DESCRIPTION:

Electro-mechanical, mechanical, electrical and civil works at various stations at Ghani oilfields as follows; a. Preventive maintenance of Storage Tanks ST 222, ST 401, ST 701 and St 201 at Ghani & Zenad Stations.

team image

Oilfield Services at Amal Oilfields

DATE OF CONTRACT:

5 October 2007

PROJECT VALUE:

USD 2,550,000.00

PROJECT DESCRIPTION:

Preventive maintenance of Storage Tanks and Pipe Lines at various stations in Amal Oilfields as follows; a. Surge Tank, Settling Tank, and Gas Boot at Station 3 b. Surge Tank, Settling Tank, and Gas Boot at Station 7

team image

Construction of 2 Pump Stations and 3 Turnout Head Works

DATE OF CONTRACT:

11 April 2005

CLIENT'S NAME:

Al-Nahr Company (fully owned by The Great man-made River Authority)

PROJECT VALUE:

USD 48 millions

CONSTRUCTION WORK:

USD 2.1millions

PROJECT LOCATION:

Garabulli, Libya

PROJECT DURATION:

12 Months

PROJECT DESCRIPTION:

Pump Stations with an average area of 5,000 sq meters 6 meter deep. The 3 Turn out Head works are 3 meter deep below grade reinforced concrete structures with a control room on the ground floor. The project required approximately 5000 cubic meters of cast in place concrete and approximately 600 Tons of Steel reinforcements

team image

Construction of Heavy Equipment Workshop

DATE OF CONTRACT:

15 March 2005

CLIENT'S NAME:

Veba Oil Operations. (Petro Canada)

PROJECT VALUE:

USD 1,290,000.00

PROJECT LOCATION:

Ghani Oilfields, Libya

PROJECT DURATION:

12 Months

PROJECT DESCRIPTION:

The project comprises of a 7.5m eaves height steel structure building with 22m span and two overhead cranes. The lean to section comprises of engine repair workshops, stores, kitchens, washrooms and offices. The facility is equipped with oil dispensers, tyre repair facilities, compressed air network, vacuum suction network, fire alarm systems, smoke alarm systems and fire fighting facilities.

team image

Construction of North Accommodation Blocks

DATE OF CONTRACT:

21 April 2003

CLIENT'S NAME:

Veba Oil Operations

PROJECT VALUE:

USD 4,150,000.00

PROJECT LOCATION:

Amal Oilfields, Libya

PROJECT DURATION:

2 years

PROJECT DESCRIPTION:

The scope of work comprised of design and construction of five new accommodation blocks at AMAL oil field. In addition to the structural design and construction of buildings, the work also included design and installation of HVAC system, telephone, electrical, general and emergency lighting, sanitary and waste water system, potable water system, fire water, fire fighting and fire alarm systems.

team image

Provision of Technical Services to Libyan Iron & Steel Company

DATE OF CONTRACT:

20 February 2003

PROJECT VALUE:

USD 1,500,000.00/ year

PROJECT DESCRIPTION:

Provision of highly skilled Engineers, Specialists, Plant Operators and Technicians in the Operations Deptt, Maintenance Deptt, Direct Reduction Plant and the Flat Mill.

team image

Construction of 177 Farm tanks at Tarhuna

DATE OF CONTRACT:

10 May 2001

CLIENT'S NAME:

Al-Nahr Company Limited (Fully owned by The Great Man-Made River Authority)

PROJECT VALUE:

USD 1,969,000.00

PROJECT LOCATION:

Tarhuna, Libya

PROJECT DURATION:

24 Months

PROJECT DESCRIPTION:

The project comprises construction of 177 farm tanks for the water supply and irrigation network. The tanks are made of reinforced concrete, 300mm thick walls and are cast in place at various locations along the network.

team image

Construction and repair of Amal Airport

DATE OF CONTRACT:

10 May 2001

CLIENT'S NAME:

Veba Oil Operations. (Petro Canada)

PROJECT VALUE:

USD 1,110,000.00

PROJECT LOCATION:

Amal Oilfields, Libya

PROJECT DURATION:

12 Months

PROJECT DESCRIPTION:

The project comprises construction and repair of an airport at Amal oilfields. Modifications were also done to the Aviation Fuel system. The repair work included rehabilitation of the existing runway strip, 7000 meters of crack widening, routing and filling with specially designed sealant, milling and dispensing machines for extreme climates.

team image

 

team image

Provision of Technical Services to Al-Nahr Company Ltd.

DATE OF CONTRACT:

2 April 2000

CLIENT'S NAME:

Al Nahr Company (Fully owned by Great Man-made River Authority)

PROJECT VALUE:

USD 2,400,000.00/ year

PROJECT LOCATION:

Brega PCC Plant

PROJECT DURATION:

Renewed annually

PROJECT DESCRIPTION:

Provision of highly skilled Engineers, Specialists, Plant Operators & Technicians in the Operations, Transportation, Manufacturing departments of the worlds biggest Prestressed Concrete Pipes (PCCP) Fabrication Plant.

team image

 

team image

Construction of Green Printing Press Complex

DATE OF CONTRACT:

8 March 1991

CLIENT'S NAME:

Libyan Investment Company, Tripoli, Libya.

PROJECT VALUE:

USD 57 millions

CONSTRUCTION WORK:

USD 6.2 millions

PROJECT LOCATION:

Sawani Road Tripoli, Libya

PROJECT DURATION:

24 Months

PROJECT DESCRIPTION:

Project Area 26,500 sq meters Portal frame building 6,300 sq meters Admn Building 1,680 sq meters Expert & workers residence, Warehouse, services building, compressor room, overhead & underground fire water tank, electrical control room, internal roads, water supply & sewage network, boundary wall.